Northbound... we've got an upbound. And that's it.
Another day, another escalator repair at our beloved Metro station. Just checked WMATA. This one is classified as a "CALLBACK/REPAIR" to be completed by 4/24/09. I read about it here first, though since that blog was posted half the escalator reopened for climbing only.
So the bad news is, we still have a busted staircase. And the worse news is, the side that is working is operating as shaky as a rope bridge with a fat lady on it.
1 comment:
A Metro elevator out of commission? No way.
Post a Comment