Wednesday, April 22, 2009

Ok but really, just fix the damn escalator

Northbound... we've got an upbound. And that's it.

Another day, another escalator repair at our beloved Metro station. Just checked WMATA. This one is classified as a "CALLBACK/REPAIR" to be completed by 4/24/09. I read about it here first, though since that blog was posted half the escalator reopened for climbing only.

So the bad news is, we still have a busted staircase. And the worse news is, the side that is working is operating as shaky as a rope bridge with a fat lady on it.

1 comment:

Brandon said...

A Metro elevator out of commission? No way.